PLANTS

Innovation for the Future

The structure and the production facilities of the special steel division are set up in such a way as to guarantee the superior homogeneity and integrity of the materials produced. The investments in new remelting plants and new production technologies allow the company to look to the future maintaining the vocation for innovation.

Image

Current electric arc furnace (EAF)

CAPACITY 

80 tons

ADVANTAGES 

• Capacity to melt whole blocks up to 15 tons


• High level of homogeneity of the material


• Inexistent risk of slag in the ladles


Secondary metallurgy

The refining plant of the company has:

  • n.03 Ladle Furnace (LF) n.03 Vacuum Degasing Stations (VD),

  • one of which ecquipped for VOD process.

Each LF is equipped with its own VD and our equipment guarantees optimal mixing of the material to obtain homogeneity and a high level of cleanliness.

CAPACITY

80 tons

The refining plant of the company has:

  • n.03 Ladle Furnace (LF)
  • n.03 Vacuum Degassing Stations (VD), one of which equipped for VOD process.

Each LF is equipped with its own VD and our equipment guarantees optimal mixing of the material to obtain homogeneity and a high level of cleanliness.

CAPACITY

80 tons

Image
Image

Bottom pouring area

The Casalgrande plant has n.02 pouring areas, the first one is the historical company's plant, while the second one is more recently. The structure and the layout of the two departments guarantees a smooth material flow and accurate reproducibility of the melting cycle.

CAPACITY 1st PLANT

max. 40 tons

CAPACITY 2nd PLANT

max. 145 tons

Annealing furnace

The Casalgrande plant has n.17 annealing furnaces.

The Casalgrande plant has n.17 annealing furnaces.

Image
Image

Slow cooling boxes

The Casalgrande plant has n.15 slow cooling boxes.

Electroslag remelting ESR

The company has state of the art facilities for the production of Electro-Slag (ESR). Continuing on the pioneering trail that has characterized the history of the company, Rubiera produced the largest Remelted ESR ingot in 15-5 PH ever.

The company has state of the art facilities for the production of Electro-Slag (ESR). Continuing on the pioneering trail that has characterized the history of the company, Rubiera produced the largest Remelted ESR ingot in 15-5 PH ever.

CAPACITY 1st PLANT

From 7 to 35 tons

CAPACITY 2nd PLANT

From 35 to 100 tons

CAPACITY 1st PLANT

From 7 to 35 tons

CAPACITY 2nd PLANT

From 35 to 100 tons

Image
Image

Vacuum arc remelting VAR

The cutting-edge plant for the vacuum arc remertling (VAR) production allows to obtain products with round sections from 500 mm to 1.070 mm.

CAPACITY

From 5 to 26 tons

The other production divisions

Stainless Steel & Alloys Division

Modernity, high performance, and energy efficiency at the new plant in Cividate al Piano.

Logo ARSS

SPECIAL STEEL DIVISION

Via XXV Aprile, 64 42013, Casalgrande (RE) - Italy

Ph. +39 0522 997200

STAINLESS STEEL & ALLOYS DIVISION

Loc.tà Motta Alta, 14 24050 Cividate al Piano (BG) - Italy

Ph. +39 0363 589800

info@arss.it

Copyright © 2026 Rubiera Special Steel S.p.A. | VAT IT00962720140 | REA RE-296541 | Social Capital € 1.000.000 I.V. | Privacy | Cookie | Credits

WHISTLEBLOWING / D.lgs n.24/2023